Inspection based risk management of electric distribution overhead lines

Adnan Hasan Tawafan, Dhafer Mayoof Alshadood, Fatima Kadhem Abd

Abstract


This paper introduces a comprehensive process based on inspection for determination of medium voltage (MV) overhead line condition and it was tried that all factors influencing the outage of distribution network integrated into one index that called condition index. A condition based failure rate model has been proposed and its unknown parameters are calculated based on historical data. Shortest path problem (SPP) model has been proposed for the long term scheduling of maintenance and reinvestment. Objective function includes sum of the reinvestment, maintenance costs, failure costs and energy not supplied (ENS) costs with considering budget and labor constraints. Finally, as a result of this research, optimal combination of various actions such as reinvestment, preventive maintenance (PM) and tree trimming and it’s scheduling has been determined over the ten and five-year horizon. Results confirmed acceptable performance of proposed method because of compliance with actual condition and engineering judgment.

Keywords


Distribution network; Reliability indices; Risk management; Shortest path problem

Full Text:

PDF


DOI: http://doi.org/10.11591/ijai.v11.i1.pp1-12

Refbacks

  • There are currently no refbacks.


Creative Commons License
This work is licensed under a Creative Commons Attribution-ShareAlike 4.0 International License.

IAES International Journal of Artificial Intelligence (IJ-AI)
ISSN/e-ISSN 2089-4872/2252-8938 
This journal is published by the Institute of Advanced Engineering and Science (IAES) in collaboration with Intelektual Pustaka Media Utama (IPMU).

View IJAI Stats